Client: Impact Investment Group CTP Scope: EPC Contract Negotiations Commissioning Support Services Technical Advisory Services Timeframe: Pre-Contract Negotiation Phase: May – Aug ’18 Construction Phase: Aug – Dec ’18 System…
When Lachlan Bateman came home after a 5 year stint in the UK working for Solar Century, he saw a gap in the fledgling Australian Solar market. While loads of…
Client: Sunshift CTP Scope: Detailed Electrical and Control System Design Timeframe: Design Phase: Jan 2018 – June 2018 Construction Phase: June 2018- Oct 2018 System Commissioning: Oct 2018 – Dec…
Client: Royal Park Tennis Club CTP Scope: Feasibility study, Tender Documents, Construction & Commissioning Oversight Timeframe: Preliminary Phase: June 2018 Design Phase: July 2018 Construction Phase: August 2018 System Commissioning:…
Client: Sun Connect CTP Scope: Grid application (Ausnet) Construction drawings Protection Switchboard Supply and Commissioning. Timeframe: Preliminary Phase: 11/2016 – 03/2017 Design Phase: 04/2017 – 10/2017 Construction Phase: 11/17 –…
Client: Renew Power Group CTP Scope: Technical Advisory Services Timeframe: Preliminary Phase: 09/2017 – 10/2017 Design Phase: 11/2017 – 02/2018 Construction Phase: 03/2018 – 05/2018 Project Goals: Technical Advisory for…
Client: BayWa R.E. Renewable Energy CTP Scope: Preliminary Engineering Design Network Modeling Grid Application. Timeframe: Preliminary Phase: 01/2017 – 04/2017 Modelling Phase: 05/2017 – 08/2017 Construction Phase: TBC System Commissioning:…
CTP Scope: HV Electrical Design Protection System Studies Earthing Design Timeframe: Design Phase: 06/2017 – 08/2017 Construction Phase: 08/17 – 12/17 System Commissioning: 12/17-02/18 Project Goals: To provide HV electrical…
Client: Australian Lamb Colac CTP Scope: AC System Design / DC Configuration Design / Grid Connection Approval with Powercor / Supply of Protection Equipment Timeframe: Preliminary Phase: Jan 2017 –…
Client: Energy Australia CTP Scope: Grid Application with AusNet Services Grid protection equipment supply incl ramp control Injection testing Timeframe: Preliminary Phase: 02/2016 Design Phase: 03-04/2016 Construction Phase: 08/2016 System…