Client: Royal Park Tennis Club CTP Scope: Feasibility study, Tender Documents, Construction & Commissioning Oversight Timeframe: Preliminary Phase: June 2018 Design Phase: July 2018 Construction Phase: August 2018 System Commissioning:…

Client: Sun Connect CTP Scope: Grid application (Ausnet) Construction drawings Protection Switchboard Supply and Commissioning. Timeframe: Preliminary Phase: 11/2016 – 03/2017 Design Phase: 04/2017 – 10/2017 Construction Phase: 11/17 –…

Client: Australian Lamb Colac CTP Scope: AC System Design / DC Configuration Design / Grid Connection Approval with Powercor / Supply of Protection Equipment Timeframe: Preliminary Phase: Jan 2017 –…

Client: Energy Australia CTP Scope: Grid Application with AusNet Services Grid protection equipment supply incl ramp control Injection testing Timeframe: Preliminary Phase: 02/2016 Design Phase: 03-04/2016 Construction Phase: 08/2016 System…