7.2 MWp Timboon West Wind Farm, Timboon, VIC

Client: BayWa R.E. Renewable Energy CTP Scope: Preliminary Engineering Design Network Modeling Grid Application. Timeframe: Preliminary Phase: 01/2017 – 04/2017 Modelling Phase: 05/2017 – 08/2017 Construction Phase: TBC System Commissioning:…

3.7 MW Dareton Coomealla Solar Park – Coomealla, NSW

Client: Belectric CTP Scope: Preliminary Engineering Design, Development Approval Co-ordination, Grid Connection Engineering Timeframe: Preliminary Design Phase: 03/2016 – 06/2016 Development Application Phase: 07/2016 – 11/2016 Grid Application Phase: 11/2016…