Client: Beon Energy Solutions
Project Goals:
- Provided engineering designs and reports for the 12MWp / 10MVA solar installation, one of the largest behind the meter systems in Australia.
- The detailed design scope included the DC electrical design, layout and general arrangements and civil & structural designs, and construction support.
CTP Scope:
- Detailed Design
Timeframe:
- Design Phase: 06/19-06/20
Project Challenges:
- Large scale solar with a number of site specific requirements from Melbourne Airport.
- Multiple design and construction teams involved requiring careful coordination, all while managing the unique challenges posed by the Covid restrictions.
Project Results:
- Delivered the design for one of the largest behind the meter solar installations in Australia.
- Enjoyed the collaboration with Beon Energy Solutions to deliver the project on budget and to the quality demanded of Melbourne Airport.
Image: Melbourne Airport